Jump to content

Another engineering design failure - this time for high speed trains


Recommended Posts

Posted

The preliminary report on why the UK's most recent high speed trains had to be withdrawn from service has been published.

Apparently metal fatigue and stress-corrosion cracking were the causes of cracking in different components.

Amazing that such design mistakes can still occur.

What a good job they were found before any accidnets were caused.

https://www.bbc.co.uk/news/uk-england-58494275

Hitachi train cracks due to fatigue and corrosion, report says

GWR train at Paddington

Posted

Maybe train designers don't think trains are subjected to extreme stesses.
Aircraft designers learned their lesson a long time ago.
Again in Britain; read up on the de Havilland Comet.
Turns out square windows in a stressed tubular structure are a no-no.

de Havilland Comet - Wikipedia

Posted
1 hour ago, studiot said:

The preliminary report on why the UK's most recent high speed trains had to be withdrawn from service has been published.

Apparently metal fatigue and stress-corrosion cracking were the causes of cracking in different components.

Amazing that such design mistakes can still occur.

What a good job they were found before any accidnets were caused.

https://www.bbc.co.uk/news/uk-england-58494275

Hitachi train cracks due to fatigue and corrosion, report says

 

From the article it appears the trains have been returned to service, without being repaired first, subject to careful monitoring to see if the cracks develop further, which they have not. So it does not look as if there is judged to be a risk of accidents due to these cracks. (The "yaw dampers" will, I presume, be the dampers that prevent the bogies from hunting at high speed.)

Posted
45 minutes ago, MigL said:

Maybe train designers don't think trains are subjected to extreme stesses.
Aircraft designers learned their lesson a long time ago.
Again in Britain; read up on the de Havilland Comet.
Turns out square windows in a stressed tubular structure are a no-no.

de Havilland Comet - Wikipedia

 

28 minutes ago, exchemist said:

From the article it appears the trains have been returned to service, without being repaired first, subject to careful monitoring to see if the cracks develop further, which they have not. So it does not look as if there is judged to be a risk of accidents due to these cracks. (The "yaw dampers" will, I presume, be the dampers that prevent the bogies from hunting at high speed.)

 

Thank you both for your thoughts.

Yes, we have discussed deHavilland before. Geoffrey was one of the most talented aircraft designers ever. But he obviously worked without the benefit of Roark or Klein-Logel.
And for fatigue, stresses don't have to be extreme, they just need sufficient repetition. I had always understood that the worst comet failures were fatigue at the root of the alloy wings.

 

I can't say I am keen on knowing that our most advanced and recent trains were designed in such a way as too need 'monitoring' well before much more elderly trains have been withdrawn from service.

 

 

 

 

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.